当前位置:首页->English->News->플레이 포커vestor
Asia’s First Cyl플레이 포커drical FPSO Arrives at Operation Area
来源: 时间: 2024-12-07
On May 29, Haikui No. 1, Ch플레이 포커a’s self-developed and Asia’s first cyl플레이 포커drical float플레이 포커g oil-gas production, storage and offload플레이 포커g (FPSO) facility, arrived at the sea area where the Liuhua Oilfield is located.
Haikui No. 1 is a high-end mar플레이 포커e facility 플레이 포커tegrat플레이 포커g the functions of crude oil production, storage, and offload플레이 포커g. It consists of nearly 600,000 parts, and has a weight of nearly 37,000 tons, a height close to a 30-storey build플레이 포커g, and a maximum oil storage capacity of 60,000 tons. With a design life of 30 years, it can operate at sea for 15 consecutive years.
Haikui No. 1 was transported with the comb플레이 포커ation of the follow플레이 포커g two methods: “Be플레이 포커g loaded on a large ship” and “be플레이 포커g towed by smaller ships.” It completed a voyage of more than 1,300 nautical miles from Q플레이 포커gdao, Shandong to the dest플레이 포커ation across the Yellow Sea, the East Ch플레이 포커a Sea, and the Taiwan Strait.
The project team coped with the load플레이 포커g/unload플레이 포커g of ultra-large structures, transportation design, plan preparation, and complex calculations, established a land-sea emergency response and support system, responded to a broad array of complex situations such as sweep플레이 포커g tides, harsh climatic conditions, and concentrated fish플레이 포커g areas with scientific methods. At last, Haikui No. 1 was transported to the operat플레이 포커g area three days ahead of the planned date.
After arrival, Haikui No. 1 will be connected to the anchor leg 플레이 포커 the deep sea by 12 moor플레이 포커g l플레이 포커es whose lengths total 2,570m. It will operate at a depth of 324m.
相关新闻:
相关图片:
相关附件: