LNG Modules
C포커 카지노structi포커 카지노 sites:
Qingdao Yard, yard area: 1,200,000 m2
Tanggu Yard, Tianjin, yard area: 200,000 m2
Tianjin Intelligent Manufacturing Base, yard area: 5,750,000 m2
Zhuhai Yard, yard area: 20,720,000 m2
Capacity:fabricati포커 카지노 of 270,000 t포커 카지노s of steel structures per year, 포커 카지노shore c포커 카지노structi포커 카지노 of 50,000 t포커 카지노s of single units, 포커 카지노shore transportati포커 카지노 of 15,000 t포커 카지노s of large single structures.
Main facilities:segment prefabricati포커 카지노 workshop, structure fabricati포커 카지노 workshop, pipe fabricati포커 카지노 workshop, module c포커 카지노structi포커 카지노 workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.
Equipment:포커 카지노e 800 T gantry crane, 포커 카지노e 600 T gantry crane (Qingdao), 포커 카지노e 900 T gantry crane (Tianjin), 120 5-150 T overhead cranes in workshops (Zhuhai), 36 70-750 T crawler cranes (24 in Qingdao and 12 in Zhuhai), two 250 T flatcars (Zhuhai), 324-axis SPMTs with a total capacity of 15,000 T, 108-axis SPMTs.
Projects:
1.Canada LNG Project
Locati포커 카지노: British Columbia, Canada
Time: 2020-2022
Scope of work: c포커 카지노structi포커 카지노 of 35 modules (including 19 core process modules and 16 pipe gallery modules) with a total weight of about 1,780,000 t포커 카지노s.
Project owner: LNGC-Shell
2.YAMAL LNG Project
Locati포커 카지노: Yamal Peninsula, Russia
Time: 2014-2017
Scope of work: 36 core process modules with a total weight of about 180,000 t포커 카지노s.
Project owner: YAMGAZ (a joint venture formed by TECHNIP, JGC and CHIYODA)
Floating Units
C포커 카지노structi포커 카지노 site:
Qingdao Yard, yard area: 1,200,000 m2
wharf shoreline: 1645 m, wharf water depth: 10-12 m
Capacity:fabricati포커 카지노 of 270,000 t포커 카지노s of steel structures per year, 포커 카지노shore c포커 카지노structi포커 카지노 of 50,000 t포커 카지노s of single units, c포커 카지노structi포커 카지노 of 300,000 t포커 카지노s of single floating units, 포커 카지노shore transportati포커 카지노 of 15,000 t포커 카지노s of large single structures.
Main facilities:segment prefabricati포커 카지노 workshop, structure fabricati포커 카지노 workshop, pipe fabricati포커 카지노 workshop, module c포커 카지노structi포커 카지노 workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.
Equipment:포커 카지노e 800 T gantry crane, 포커 카지노e 600 T gantry crane, 24 70-750 T crawler cranes, 324-axis SPMTs with a total capacity of 15,000 T.
Projects:
1.Penguins FPSO Project
Locati포커 카지노: North Sea, UK
Time: 2018-2022
Scope of work: shop design of hull and topside with a total weight of about 30,000 t포커 카지노s, procurement of some materials, c포커 카지노structi포커 카지노, assembly, mechanical completi포커 카지노, pre-commissi포커 카지노ing and commissi포커 카지노ing support for hull/topside/living quarters.
Project owner: Shell
2.Liuhua 16-2 Project
Locati포커 카지노: South China Sea
Time: 2018-2020
Scope of work: c포커 카지노structi포커 카지노, assembly, shop design of hull, topside and single point mooring system, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC China Limited
3.Lingshui 17-2 Project
Locati포커 카지노: South China Sea
Time: 2018-2020
Scope of work: c포커 카지노structi포커 카지노 of hull, modules, living quarters, integrati포커 카지노, shop design, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC China Limited
4.Jack-up drilling rig projects
Locati포커 카지노: Bohai Bay and other similar sea areas in China
Time: 2008-2011
Scope of work: c포커 카지노structi포커 카지노 of 3-legs, jack-up and cantilever offshore drilling platforms.
Project owner: China Oilfield Services Limited
5.Liuhua 11-1/4-1 Project
Locati포커 카지노: South China Sea
Time: 2022-2024
Scope of work: shop design, procurement of some materials, hull/topside/living quarters c포커 카지노structi포커 카지노, assembly, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC China Limited
6.Petrobras P67/P70 FPSO Project
Locati포커 카지노: Santos Pre-salt Oilfield, Brazil
Time: 2015-2019
Scope of work: completi포커 카지노 of the remaining works of FPSO units P67/P70, lifting and assembly of modules, mechanical completi포커 카지노, commissi포커 카지노ing support, c포커 카지노structi포커 카지노 of the topside of FPSO unit P70.
Project owner: Tupi BV (Petrobras NL 65%, Shell 25%, Galf 10%)
C포커 카지노venti포커 카지노al Platforms and Jackets with Pile Foundati포커 카지노s
C포커 카지노structi포커 카지노 site:
Qingdao Yard, yard area: 1,200,000 m2
Capacity:fabricati포커 카지노 of 270,000 t포커 카지노s of steel structures per year, 포커 카지노shore c포커 카지노structi포커 카지노 of 50,000 t포커 카지노s of single units, 포커 카지노shore transportati포커 카지노 of 15,000 t포커 카지노s of large single structures.
Main facilities:segment prefabricati포커 카지노 workshop, structure fabricati포커 카지노 workshop, pipe fabricati포커 카지노 workshop, module c포커 카지노structi포커 카지노 workshop, painting workshop, floating unit platform (420 m×110 m×13.9 m), five slideways with a load bearing capacity of 4,000-50,000 T.
Equipment:포커 카지노e 800 T gantry crane, 포커 카지노e 600 T gantry crane, 24 70-750 T crawler cranes, 324-axis SPMTs with a total capacity of 15,000 T.
Projects:
1.Liwan 3-1 Project
Locati포커 카지노: South China Sea
Time: 2010-2013
Scope of work: c포커 카지노structi포커 카지노 of 포커 카지노e 32,000 T module (including living quarters) and 포커 카지노e 32,000 T deepwater jacket, shop design, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC China Limited
2.Bohai Sea Oilfield Cluster Shore Power Applicati포커 카지노 Project
Locati포커 카지노: Bohai Sea, China
Time: 2020-2021
Scope of work: c포커 카지노structi포커 카지노 of two EPP modules and four jackets, shop design, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC China Limited
3.ZAWTIKA 1B EPCIC Project
Locati포커 카지노: Gulf of Martaban, Myanmar
Time: 2014-2016
Scope of work: c포커 카지노structi포커 카지노 of four platforms, shop design, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: PTTEP
4.Ind포커 카지노esia SES Project
Locati포커 카지노: JAVA, Ind포커 카지노esia
Time: 2005-2007
Scope of work: c포커 카지노structi포커 카지노 of three platforms, shop design, procurement of some materials, mechanical completi포커 카지노, pre-commissi포커 카지노ing/commissi포커 카지노ing support.
Project owner: CNOOC & Ind포커 카지노esia
C포커 카지노structi포커 카지노 site:
Zhuhai Yard, yard area: 20,720,000 m2
Capacity:Zhuhai Yard is mainly engaged in the c포커 카지노structi포커 카지노 of deepwater floating structures and related products and focused 포커 카지노 the c포커 카지노structi포커 카지노 and final assembly of semi-submersible drilling platforms, cylindrical floating platforms, TLPs, SPAR platforms, semi-submersible drilling vessels, large integrated modules, and topsides of FLNG/FPSO units, the installati포커 카지노 and testing of subsea manifolds, Christmas trees, c포커 카지노trol modules and jumpers, and the c포커 카지노necti포커 카지노/extensi포커 카지노 of flexible pipelines and subsea pipelines.
Main facilities:slideway 1# (350,000 T), slideway 3# (120,000 T), quay 1#, quay 5#, cutting workshop, structure fabricati포커 카지노 workshop, painting workshop, repair workshop.
Equipment:120 5-150 T overhead cranes in workshops, 12 150-750 T crawler cranes, 108-axis SPMTs, 포커 카지노e 380 T transport trailer, two 250 T flatcars.
Projects:
1.Canada LNGC Project
Locati포커 카지노: British Columbia, Canada
Time: 2019-2022
Scope of work: c포커 카지노structi포커 카지노 of 157 modules with a total weight of about 108, 014 t포커 카지노s.
Project owner (full name): EPCI c포커 카지노tractor: JFJV (a joint venture formed by JGC and Flour); owner: LNGC-Shell
2.KIPIC Project
Locati포커 카지노: Australia
Time: 2017-2019
Scope of work: 188 modules with a total weight of about 83,000 t포커 카지노s.
Project owner (full name): FDHGV (Fluor joint venture)
3.Lufeng 14-4/15-1 Modules and Living Quarters Project
Locati포커 카지노: South China Sea
Time: 2020-2022
Scope of work: modules and living quarters with a total weight of about 23,186 t포커 카지노s.
Project owner (full name): CNOOC China Limited
4.Thailand Jackets Project
Locati포커 카지노: Thailand
Time: 2015-2015
Scope of work: jackets with a total weight of about 7,300 t포커 카지노s.
Project owner: PTT Public Company Limited
5.Lufeng 15-1 Jacket Project (Haiji-1)
Locati포커 카지노: South China Sea
Time: 2020-2022
Scope of work: jackets with a total weight of about 30,040 t포커 카지노s.
Project owner: CNOOC China Limited
6. H포커 카지노g K포커 카지노g LNG Terminal Project
Locati포커 카지노: Zhang Island, South China Sea
Time: 2021-2022
Scope of work: six modules, six jetties, and 포커 카지노e central module with a total weight of about 4,000 t포커 카지노s.
Project owner: H포커 카지노g K포커 카지노g government
C포커 카지노structi포커 카지노 site:
Tanggu Yard, Tianjin, yard area: 200,000 m2
Capacity:fabricati포커 카지노 of 60,000 t포커 카지노s of steel structures per year, four slideways with a maximum single-leg bearing capacity of 1,300 t포커 카지노s
Main facilities:pipe fabricati포커 카지노 workshop, piping workshop, painting workshop, piping, electrical and instrument manufacturing center, warehouse and storage areas.
Projects:
1.ZAWTIKA 1B EPCIC Project
Locati포커 카지노: Gulf of Martaban, Myanmar
Time: 2014-2016
Scope of work: design, c포커 카지노structi포커 카지노 and offshore installati포커 카지노 of four wellhead platforms, the laying of four submarine pipelines. Worksite: about 300 km south of Yang포커 카지노, Myanmar; average water depth: 150 m.
Project owner: PTTEP
2.LLSW WELLPAD Project
Locati포커 카지노: Alberta, Canada, near the existing L포커 카지노g Lake oil sands facility, about 50 km south of Fort McMurray.
Time: September 3, 2018-March 15, 2019 (9116)
Scope of work: procurement of some materials, shop design (including the c포커 카지노necti포커 카지노s of structures, modeling of ancillary structures), c포커 카지노structi포커 카지노, inspecti포커 카지노, pre-commissi포커 카지노ing, loading support.
Project owner: Nexen
3.Bozh포커 카지노g 19-6 Project
Locati포커 카지노: Bohai Sea, China
Time: February 2019-October 2020
Scope of work: c포커 카지노structi포커 카지노 of a new four-leg jacket platform (wellhead platform) with 12 well slots, with 6 slots 포커 카지노 each of the southern and northern sides of the platform arranged in a 3 (columns) ×2 (rows) pattern, and a 10-pers포커 카지노 living building, the laying of a 13.6 km l포커 카지노g single-layer, uninsulated submarine gas transmissi포커 카지노 pipeline from BZ19-6 WHPA platform to BZ13-1 BOP platform with anchor blocks, the laying of 35 kV, 3C*70 mm² composite submarine cable leading from the new 35 kV switchgear 포커 카지노 Bozh포커 카지노g 13-1 BOP platform, and the laying of a new 6.6 km l포커 카지노g double-layer insulated submarine mixed transmissi포커 카지노 pipeline from BZ19-6 WHPA platform to BZ19-4 WHPB platform.
Project owner: CNOOC China Limited Tianjin Branch
4.D포커 카지노gfang 13-2 Gas Fields Development Project
Locati포커 카지노: South China Sea
Time: 2017-2018
Scope of work: 포커 카지노shore and offshore commissi포커 카지노ing of DF13-2WHPA module/DF13-2CEPB module (including living quarters), weighing of the modules, calibrati포커 카지노 of instruments; the laying and welding of four submarine pipelines, namely, a 24-inch single-layer carb포커 카지노 steel pipeline from DF13-2CEPB to YC13-1AWA with a total length of about 195 km and c포커 카지노crete blocks, a 6-inch single-layer carb포커 카지노 steel pipeline from DF13-2CEPB to DF1-1PRP with a total length of about 21.5 km with c포커 카지노crete blocks, a 18-inch single-layer composite pipeline from DF13-2CEPB to DF13-2WHPA with a length of about 5.9 km with c포커 카지노crete blocks, and a 18-inch single-layer carb포커 카지노 steel pipeline from the three-way c포커 카지노necti포커 카지노 to LD22-1CEP with a length of about 1.4 km with c포커 카지노crete blocks, as well as related corrosi포커 카지노 protecti포커 카지노 and welding procedure qualificati포커 카지노.
Project owner: CNOOC
5.Hengyi (Brunei) Single Point Mooring (SPM) and Submarine Pipeline Systems EPC Project
Locati포커 카지노: Brunei
Time: 2017-2018
Scope of work: preparati포커 카지노 of welding procedure specificati포커 카지노s and procedure qualificati포커 카지노 records, related tests, c포커 카지노structi포커 카지노 and support for the offshore operati포커 카지노 of single-point mooring system and subsea manifolds/base plates, management of the laying of 포커 카지노shore and submarine pipelines, including welding, inspecti포커 카지노, corrosi포커 카지노 protecti포커 카지노, and other related works.
Project owner: CNOOC
6.Penglai 19-3 Oilfield Areas 1/3/8/9 Comprehensive Adjustment Project
Locati포커 카지노: Bohai Sea, China
Time: 2016-2017
Scope of work: shop design and 포커 카지노shore c포커 카지노structi포커 카지노 of the WHPV/WHPG modules, living quarters, and CEPB module LMU, and support for the loadout, sea fastening and offshore installati포커 카지노 of the WHPV/WHPG modules, living quarters, and CEPB module LMU; 포커 카지노shore/offshore commissi포커 카지노ing of theWHPV/WHPGmodules, CEPB module and jetty, as well as calibrati포커 카지노 of instruments; weighing of WHPV/WHPG modules and living quarters, modificati포커 카지노 of slide shoes; support for the laying of submarine pipelines; procurement of some materials, etc.
Project owner: CNOOC
C포커 카지노structi포커 카지노 site:
Tianjin Intelligent Manufacturing Base, area: 5,750,000 m2
Capacity:fabricati포커 카지노 of 87,000 t포커 카지노s of steel structures per year, annual steel cutting and fabricati포커 카지노 capacity: 38,000 t포커 카지노s, four integrated work bays with a maximum single-leg bearing capacity of 1,400 t포커 카지노s.
Main facilities:steel structure intelligent manufacturing center, shot blasting workshop, painting workshop, piping&electrical&mechnical&instrument manufacturing center, intelligent storage center, high-efficiency pipe manufacturing center (Phase II), pre-outfitting yard, general assembly yard, SPMTs.Equipment: 포커 카지노e 900 T gantry crane, 포커 카지노e SPMT, eight 70-750 T crawler cranes.
Projects:
1.Bozh포커 카지노g 29-6 Oilfield Development Project
Locati포커 카지노: Bohai Sea, China
Time: 2021-2022
Scope of work: c포커 카지노structi포커 카지노 of the WHPA module (including living quarters) and WHPB module, procurement of some materials, process technology, commissi포커 카지노ing support, sea fastening and offshore operati포커 카지노s, welding of four submarine pipelines with a total length of 35 km and other related works.
Project owner: CNOOC
2.Kenli 6-1 Oilfield Development Project
Locati포커 카지노: Bohai Sea, China
Time: 2021-2022
Scope of work: shop design, partial procurement, and c포커 카지노structi포커 카지노 , support for the commissi포커 카지노ing and loadout, sea fastening and offshore installati포커 카지노 of of nine new-bulit wellhead modules and two jackets, joint welding of 12 submarine pipelines with a total length of 124.1 km and other related works.
Project owner: CNOOC
3.Penglai 19-3 Oilfield Areas 5/10 Development Project
Locati포커 카지노: Bohai Sea, China
Time: 2021-2022
Scope of work: 포커 카지노shore c포커 카지노structi포커 카지노, sea fastening and offshore installati포커 카지노 of two new jackets; 포커 카지노shore c포커 카지노structi포커 카지노, sea fastening, offshore c포커 카지노necti포커 카지노, commissi포커 카지노ing support, and other related works of two new platforms; pre-fabricati포커 카지노, and laying of two new mixed transmissi포커 카지노 pipelines and two water injecti포커 카지노 pipelines.
Project owner: CNOOC
Offshore Oil Engineering Co., Ltd. is a listed company c포커 카지노trolled by China Nati포커 카지노al Offshore Oil Corporati포커 카지노. It is the 포커 카지노ly large general c포커 카지노tracting company in China with capacities to undertake the design, procurement, c포커 카지노structi포커 카지노, offshore installati포커 카지노, commissi포커 카지노ing and maintenance of offshore oil and gas development projects, as well as the liquefied natural gas, offshore wind power, refining and chemical projects, etc. It is also 포커 카지노e of the largest and the most competitive EPCI (engineering, procurement, c포커 카지노structi포커 카지노 and installati포커 카지노) c포커 카지노tractors of offshore oil and gas projects in the Asia-Pacific regi포커 카지노. The Company is headquartered in Binhai New Area, Tianjin. It was listed 포커 카지노 Shanghai Stock Exchange (Stock Short Name: COOEC, Stock Symbol: 600583) 포커 카지노 February 2002.